Articles in this section

How to add RedVision® to an existing Manager30 S2 setup

For Manager30 S2 systems being upgraded with RedVision®, the original BMS remote is no longer needed and the RBUS cable routing must be adjusted. 

 

The existing remote cable can either be redirected from the 3-way RBUS connector to a port on the TVMS1280 Distribution Box, with the supplied RJ45 cable linking the box to the RedVision Pro Display, or the supplied RJ45 cable can connect the 3-way RBUS connector to the Distribution Box, while the existing cable links the box to the RedVision Pro Display.

 

REDARC recommends seeking the support of a qualified auto electrician or technician.

Important

For your safety, REDARC recommends installation by a qualified technician. Seek support from a REDARC recommended dealer or installer - Find Your Local Installer

This information is applicable to the following products:

  • Manager30 S2 Battery Management System (BMS1230S2)

When expanding your existing Battery Management System to include RedVision®, the existing BMS1230S2 Remote is no longer required and a small difference to the RBUS Communication Cable routing is necessary.

The original RBUS connected to the BMS Remote will need to be re-used, through either of the following methods:

  • You may redirect the existing remote cable from the 3-way RBUS connector to one of the RBUS ports on the TVMS1280-DB Distribution Box (not the Inverter port), and use the supplied 1m RJ45 cable to connect the TVMS1280-DB to the DISP4300 Display. This setup is outlined in the diagram below.
  • Alternatively use the supplied 1m RJ45 cable - fitted in place of the existing remote cable at the 3-way RBUS connector – and connect the TVMS1280-DB Distribution Box to the 3-way RBUS connector. Then use the existing remote cable to join the Distribution Box to the DISP4300 Display.
Wiring diagram for replacing Manager30 S2.
Was this article helpful?
0 out of 0 found this helpful